Eliminate Holes Being Drilled In Your Floor

This system consists of lightweight re-usable plastic brackets and an adhesive backed shoe.

The bracket snaps into the shoe plate that is held firmly to the casting slab by the adhesive base. 

 

  • No patching required
  • Re-usable brackets
  • Recycled composite plastic
  • Reduces installation time up to 60%
  • No Drill Bits
  • Super Quick
  • Lightweight

 2015 02 16 17.23.57

SLAB SAVER INFORMATION AND CODES
PRODUCT 124mm Bracket 170mm Bracket Sticky Shoe Xylene (Cleaner) Spray Adhesive
CANZAC CODE 97 010 97 020 97 030 97 040 97 052
UNITS/BAG Each (150/box) Each (150/box) Each (150/box) 1Ltr Bottle Can (24 Cans/box)

 

 

2015 02 16 17.24.16

 WHAT IS AND WHY USE THE SLAB SAVER SYSTEM

On site you may consider pouring the concrete wall panels onto the concrete slab and lifting into place rather than taking delivery of pre-cast.

The process has a down side which would mean you need to drill and fasten into your floor slab, these holes when finished would need to be patched.

The slab saver shoe sticks and stays in place by incorporating a very strong self adhesive pad. The slab saver bracket is inserted into the shoe and fixed onto your boxing through the pre-existing, fixing holes, this can reduce installation time up to 60%, when you are finished the shoe would only require a bit of a nudge off with something like a shovel, no damage to your slab, no patching or time costing repair required. The brackets are re-usable but we do not recommend re-using the shoe.

NOTE

Important to note if the slab has a bond breaker applied this would need to be removed by using our xylene product and the slab should be dry and clean.

 