ANZ Triangle Centre

ANZ Triangle Centre

type of project
Infrastructure / Civil
Project location
Christchurch Central
Project size
10,000m2 +
Roles that canzac played in this project
Construction
Engineering
Product Recommendation and Supply

Project Challenge

1870m3 of concrete pouring into a Christchurch central city construction site's basement.

The pour laid the foundation for the new ANZ Centre on the site of the former Triangle Centre, bordering High, Cashel and Colombo Streets.

Leighs Construction workers started the massive task at 1am and worked until late afternoon, with about 1870m3 of concrete pouring into a Christchurch central city construction site's basement.

The Canzac Solution

Canzac supplied the project with our iconic Speedform and Ecoform products.

Speed Form can be delivered to site in virtually any module size to fit any foundation or wall height required. With no cutting required onsite, it saves on both time and money.

The Benefits & Results

  • Arrives pre-formed, meaning it can be installed by unskilled labours.
  • Delivered to site in virtually any module size required.
  • Ideal for radius applications.
  • Fast and easy to install.
  • Larger use for applications due to its versatility